Second 3D Seismic Survey for PGS – 2012

Adding another feature to our service excellence we also successfully secured the 2nd 3D Seismic Survey in 2012 which paved the way for Hayleys Energy Services, to further strengthen its close ties with the international Oil & Gas arena. The survey which took place in the Mannar Basin was assisted with highly specialized services ranging from Chase Boats, Local Interpreters, Helicopter Logistics, Navy Personnel, Travel and Crew Transfers etc